What are the seven installation points of the plastic meter box (ready board with bulkhead)?
The plastic meter box (ready board with bulkhead) is applicable to the power supply system with AC 50Hz or 60Hz, rated working voltage of 230V, 380V and 690V, and rated working current of 5A ~ 225A. What are the seven points for attention when it comes to the installation of the plastic meter box (ready board with bulkhead)?
1. Please carefully check the integrity of all parts of the meter box (ready board with bulkhead) during installation;
2. The meter box (ready board with bulkhead) shall be installed vertically, and the inclination angle shall not exceed 5 °;
3. The installation position shall be selected where there is no violent vibration and impact is not enough to damage the electrical components;
4. Since the materials used in the meter box (ready board with bulkhead) are not resistant to strong alkali, oxidizing acid, amine and ketone, and are soluble in hydrogenation diameter and aromatic solvent, contact with these chemicals should be avoided;
5. During use, sharp objects and hard objects shall be avoided from colliding and scratching the surface of the meter box (ready board with bulkhead);
6. Maintain and clean the surface of the meter box (ready board with bulkhead) during use;
7. When installing the electric meter box (ready board with bulkhead), try to choose a cool and dry place to avoid direct sunshine for a long time, so as to extend the service life of the electric meter box (ready board with bulkhead), electric energy meter and electrical components.