What are the details to pay attention to when assembling a lighting split meter ready board?
The assembly of lighting split meter ready boards requires attention to the following details:
Box selection: The split meter ready board must be intact and can be made of metal or plastic, ensuring good insulation performance.
Internal layout: Neutral wires, protective grounding wires, phase wires, and other wiring busbars should be installed inside the box, and they should be intact and undamaged. At the same time, the components inside the box should be complete, the wiring should be neat, and the wiring should be correct.
Firmly installed: The split meter ready board should be installed firmly, horizontally and vertically, and the vertical deviation should not be too large. At the same time, there should be no gaps around the split meter ready board during concealed installation, and the edges around the panel should be tightly attached to the wall.
Clear identification: The split meter ready board should indicate the names of each circuit, and different levels of power supplies should have clear markings and numbers for ease of use and maintenance.
Safety protection: The detachable metal plate inside the split meter ready board should have reliable grounding protection. The power line should be connected to the middle contact terminal, and the load line should be connected to the threaded terminal to ensure electrical safety.
In summary, the assembly of lighting split meter ready boards requires attention to multiple details, and the proper handling of these details will directly affect the effectiveness and electrical safety of the split meter ready board.