Blog

The six points of FRP meter box (split meter ready board) doomed the product to be extraordinary

Publish Time: Author: Site Editor Visit: 355

1. Excellent corrosion resistance of meter box (split meter ready board)

It can effectively resist the corrosion of water, gasoline, alcohol, electrolytic salt, acetic acid, sodium potassium compounds, asphalt, various acid-base soils and acid rain. The product itself has excellent anti-aging performance. The appearance of the finished product has a protective layer with strong ultraviolet resistance. The double physical protection finished product has higher anti-aging performance.

2. The material of the meter box (split meter ready board) is a smokeless and non-toxic material

It contains no halogen, no harmful substances to human body, and no harmful gases when burned. It is an environmental friendly material and meets the needs of future development.

3. The meter box (split meter ready board) adopts plate structure combination

Modular installation, suitable for handling, simple installation, search engine optimization ranking, on-site assembly and disassembly. The appearance of the cabinet is cast with diamond shaped protrusions, which has the function of preventing small advertisements from being pasted.

4. Suitable for all kinds of bad weather

It can be used in the environment of - 50-160 ℃ for a long time, and the protection grade is IP55

5. Excellent insulating materials

High performance insulation resistance prevents leakage, maintains excellent dielectric performance at high frequency, does not reflect, blocks the transmission of microwave and does not rust. It can be used for a long time. It is suitable for use in crowded or narrow places to avoid signs of human electric shock.

6. Three dimensional network molecular structure and reinforcing fiber

This material has excellent impact resistance, is easy to machine, drill, cut and position correctly. It has high tensile strength, variable modulus of elasticity and impact toughness.

Next Pay attention to the following points when installing and using the meter box (split meter ready board)