Blog

Simple Analysis of the Points to Be Paid Attention to in the Installation of the meter Box or ready board

Publish Time: Author: Site Editor Visit: 466

1. Please carefully check the integrity of all parts of the meter Box or ready board when installing the meter Box or ready board.

 

2. The installation position of the meter Box or ready board shall be selected where there is no violent vibration and impact that is not enough to damage the electrical components.

 

3. The meter Box or ready board shall be installed vertically, and the inclination angle shall not exceed 5 °.

 

4. The electricity meter Box or ready board shall be maintained and cleaned during use.

 

5. The materials used in the meter Box or ready board are not resistant to strong alkalis, oxidizing acids, amines and ketones, and are soluble in hydrogenated and aromatic solvents, so contact with these chemicals should be avoided.

 

6. Avoid sharp objects and hard objects from scratching the surface of the meter Box or ready board during use.

Next Precautions for incoming and outgoing lines of the meter box or ready board!