Pay attention to the following points when installing and using the meter box (split meter ready board)

Publish Time: Author: Site Editor Visit: 390

Pay attention to the following points when installing and using the meter box (split meter ready board):

 

1. When installing, try to choose a cool and dry place to avoid direct sunlight exposure for a long time, so as to extend the service life of the meter box (split meter ready board), electric energy meter and electrical components;

 

2. Please carefully check the integrity of all parts of the meter box (split meter ready board) during installation;

 

3. The installation position shall be selected where there is no violent vibration and impact, which is not enough to damage the electrical components;

 

4. The meter box (split meter ready board) shall be installed vertically, and the inclination angle shall not exceed 5 °;

 

5. Maintain and clean the surface of the meter box (split meter ready board) during use;

 

6. During use, sharp objects and hard objects shall be avoided to collide and scratch the surface of the meter box (split meter ready board);

 

7. Because the materials used in the meter box (split meter ready board) are not resistant to strong bases, oxidizing acids, amines and ketones, and are soluble in hydrogenated and aromatic solvents, they should not be contacted with these chemicals;