During the use of the electric meter box (ready board with bulkhead), sharp objects and hard objects shall be avoided from colliding and scratching the surface of the electric meter box (ready board with bulkhead). During the installation of the electric meter box (ready board with bulkhead), a cool and dry place shall be selected as far as possible to avoid direct sunshine for a long time, so as to prolong the service life of the electric meter; Our company is an enterprise specializing in the development and production of electric meter box (ready board with bulkhead)es; Among them, the PC meter box (ready board with bulkhead) is the main product of the company. The product is made of imported polycarbonate (PC) and imported flame retardant ABS engineering plastics, and has the advantages of water leakage, easy management, electricity theft and UV resistance.
Precautions for maintenance of electric meter box (ready board with bulkhead):
1. All electrical switches on the meter box (ready board with bulkhead) shall be flexible and reliable without significant noise. The connecting wire junction and terminal post shall be free from looseness. The steel wire at the connecting wire junction of the moving contact shall be free from fracture.
2. When replacing the circuit breaker, the current of the circuit breaker shall match the current of the circuit.
3. There are different kinds of voltages on the control box. During maintenance, the circuit must be distinguished to prevent short circuit accidents.