Blog

How to install the split meter ready board? Basic precautions for split meter ready board installation

Publish Time: Author: Site Editor Visit: 235

The installation of the split meter ready board needs to be carried out by a professional electrician. The following are the basic precautions:

Choose a suitable location: The location for installing the split meter ready board should be in a well-ventilated, dry and easy-to-operate place, away from flammable substances.

Reasonable height: When installing the split meter ready board, make sure it is at a reasonable height to facilitate reading and operation. It is usually installed below eye level.

Fix firmly: The split meter ready board should be installed on a solid, vertical wall, and appropriate fixing devices should be used to ensure firmness and reliability.

Ground protection: Ensure that the split meter ready board is connected to a good grounding system to provide effective protection against current flow.

Use of protective cover: Install the protective cover to prevent external objects from entering and ensure the safety inside the split meter ready board.

Code Compliance: The installation process must comply with local electrical codes and regulations to ensure safety and compliance.

Professional construction: The installation of the split meter ready board should be carried out by professional electricians with relevant qualifications and experience to ensure project quality and safety.

Safety is the primary concern in any electrical project. If you do not have the relevant experience and skills, be sure to seek help from a professional electrician.

Next Why should the meter be placed in the meter box?